IT / Telecom Engineer - Abu Dhabi

Site Survey Feasibility Closure for initial requirement.
OFC Calculation, Procuring exact required hardware based on BW and Ring Topology.
Based on Requirement providing hardware and OFC Capex.
For Bandwidth Consumption Purpose analyze the Existing Ring Bandwidth capacity based make Ring Balancing Activity.
Planning ring topology Migration / up-gradation Node Deletion and requirement of hardware for SDH & WDM ring topology Network.
Handling service delivery and assurance: PRI, ILL, NPLC, IPLC & MPLS VPN via OFC and UBR Circuit.
Testing SDH, WDM links like - IPVPN / NPLC / IPLC / SIPT / MPLS-L1, L2, L3/ ILL / PRI for Enterprise and Carrier.
Implementing and dismantling of equipment ECI (SDH) and Huawei (SDH & WDM).
Worked on Various Fibre Backbones (STM-1, STM-4, STM-16, and STM-64) using ECI, Huawei Equipment.
Configuration and troubleshooting in Pine 1, 4, 8 & Pine155, E-Sona Modems, F-Cat Modem, HP, CISCO, Huawei, MROTEK switches and routers.

Posted on : 7 years ago, #70141, 5 views, Edit

It is NOT ok to contact this poster with other commercial interests.

← Previous Next →

syed.90

https://gulfclassifieds.org/70141

Abu Dhabi, UAE

View all ads by syed.90 (10)

Phone : 0588449591

Email : [email protected]